Skip to main content
Our Projects Portfolio

Grid Code Roadmap Development

Location

Middle East

SErvice(s) Provided

Grid studies
Stakeholder management
Regulations

Project Scope:
Strategic advisory support for the development and phased implementation of a Grid Code for a future 100% renewable-based power system (targeting ~110 TWh wind and PV annually). The assignment focused on designing a structured roadmap for the initial Grid Code release, considering the transition from reliance on the national grid toward a fully autonomous system.

The project combined regulatory review, strategic advisory, and governance framework development to ensure a robust, future-proof Grid Code aligned with evolving system conditions and stakeholder needs.

Key Responsibilities & Achievements

  • Regulatory Review & Technical Assessment
  • Conducted comprehensive review and consolidation of the draft Grid Code, technical rules, licenses, standards, and legislative documents.
  • Identified regulatory gaps, inconsistencies, transition risks, and technical shortcomings.
  • Proposed targeted recommendations, including mechanisms such as derogations and phased or retroactive application of technical requirements.
  • Assessed the impact of transition measures on stakeholders and system development scenarios.

Strategic Advisory & Roadmap Design

  • Developed a structured implementation roadmap for phased Grid Code release aligned with system evolution.
  • Defined strategies to adapt grid requirements over time, reflecting increasing renewable penetration and operational complexity.
  • Documented the baseline regulatory framework and identified inefficiencies and long-term risks.
  • Provided guidance on future-proofing grid requirements considering operational, market, and technical challenges.

Governance & Stakeholder Management Framework

  • Designed a structured stakeholder consultation and code modification process.
  • Established guiding principles for transparent, inclusive, and effective stakeholder engagement (internal and external).
  • Defined governance mechanisms to support version control, review cycles, and formal approval processes for future Grid Code updates.

Project Delivery Phases:

  • Inception & methodology definition
  • Regulatory and technical assessment
  • Stakeholder consultation workshops
  • Roll-out and implementation planning
  • Detailed Grid Code review sessions
  • Final roadmap consolidation and closure

Outcome

Delivered a comprehensive Grid Code roadmap and governance framework enabling structured, transparent, and future-ready regulatory development. The project established the foundation for a resilient, renewable-dominant power system transitioning from grid dependency to autonomous operation.

Comments (1)