Stevin Operational Impact

Timeframe: 2008 - 2017

Special protection schemes were developed to avoid loss of load in case of an outage of the Stevin line


The project in a nutshell

The project aims to build a strong 380 kV backbone between coastal and inland parts and will play a vital role in the future of the Belgian electricity supply by ensuring that power generated by offshore wind farms can be brought on shore and transmitted further inland.





Need more info? Do not hesitate to contact us!