Country:
Timeframe: March 2017 - November 2017
This was a unique project, the first of its kind. It combines a very high level of detail with a wide range of considered aspects in short timeline. The spectrum of analysis ranges from political decision making to very specific operational and asset details
The project in a nutshell
Wide assessment of the Vietnamese transmission grid and its operator based on specific KPIs regarding to regulation, operations, organizational structure and asset management. From this assessment arose a comprehensive recommendation roadmap aiming at overcoming the current and future challenges.