Timeframe: September 2015 - December 2015

Finding the right connection point/substation to integrate an international HVDC interconnector


The project in a nutshell

The project focus was on conducting a feasibility study on possible connection points for a HVDC connector and on evaluating network constraints and possible network development branches.