Country: Germany
Timeframe: September 2015 - December 2015
Finding the right connection point/substation to integrate an international HVDC interconnector
The project in a nutshell
The project focus was on conducting a feasibility study on possible connection points for a HVDC connector and on evaluating network constraints and possible network development branches.
Need more info? Do not hesitate to contact us!